21. Dec 2012

Project Wagner Commissioned in Palm Springs, CA

Commissioning occurred for Project Wagner, a 6 MW wind energy Project located at the gateway to Palm Springs, California, on December 21, 2012. Project Wagner was developed and constructed by WKN USA, LLC for its majority shareholder, BayWa r.e USA, LLC, and its total capacity of 6 MW is the equivalent of 60 of the older 100 kW machines populating most of the surrounding San Gorgonio Pass. Commissioning for this high visibility project occurred on time and on budget.

In late May 2012 WKN USA, LLC reinforced its strong relationship with Vestas American Wind Technology, Inc. (Vestas) through the successful negotiation and execution of a turbine supply and installation agreement between WKN Wagner, LLC (Project Wagner) and Vestas for two V90 – 3.0MW machines. WKN USA, LLC will manage and operate all aspects of Project Wagner on behalf of BayWa r.e USA, LLC. 

Contact details

BayWa r.e. Wind, LLC
Suite 1470
4365 Executive Drive
San Diego, CA 92121

Phone: + 1 858 450 6800
Fax: +1 858 450 6801
Email: info@baywa-re.us